IAC Assessment: SD0409
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0409
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2008
Principal Product Pork Rinds
NAICS 311919 - Other Snack Food Manufacturing
SIC 2096 - Potato Chips And Similar Snacks
Sales $10,000,000-$50,000,000
# of Employees 73
Plant Area (Sq.Ft.) 27,500
Annual Production 9,000,000 Pounds
Production Hrs. Annual 4,500
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,444 558,560 kWh $0.08
Electricity Demand $21,615 1,400 kW-months/year $15.44
Electricity Fees $7,479 - $ -
LPG $77,786 9,025 MMBtu $8.62
Other Gas $6,291 - MMBtu -
TOTAL ENERGY COSTS $159,615
RECOMMENDED SAVINGS* $46,741 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,943
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$36,255
Cost:
$192,000
$37,939 456,000 $21,615 1,400 - - $(-20,991) (-2,435) $(-2,308) - $37,939
456,000
kWh
$21,615
1,400
kW-months/year
-
-
MMBtu
$(-20,991)
(-2,435)
MMBtu
$(-2,308)
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,543
Cost:
$8,540
- - - - $3,543 411 - - - - -
-
kWh
-
-
kW-months/year
$3,543
411
MMBtu
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,066
Cost:
$6,344
$2,236 26,880 $830 54 - - - - - - $2,236
26,880
kWh
$830
54
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,423
Cost:
$6,590
$1,037 12,462 $386 25 - - - - - - $1,037
12,462
kWh
$386
25
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,387
Cost:
$2,539
$1,387 16,673 - - - - - - - - $1,387
16,673
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,067
Cost:
$183
$1,067 12,822 - - - - - - - - $1,067
12,822
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$46,741
Cost:
$216,196
$43,666 524,837 $22,831 1,479 $3,543 411 $(-20,991) (-2,435) $(-2,308) - $43,666
524,837
kWh
$22,831
1,479
kW-months/year
$3,543
411
MMBtu
$(-20,991)
(-2,435)
MMBtu
$(-2,308)
-
$
TOTAL IMPLEMENTED Savings:
$6,943
Cost:
$15,656
$5,727 68,837 $1,216 79 - - - - - - $5,727
68,837
kWh
$1,216
79
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Other Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Gas Administrative Changes