IAC logo
IAC Assessment: SD0422
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0422
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2009
Principal Product AIRCRAFT FASTENERS
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales <$500,000
# of Employees 160
Plant Area (Sq.Ft.) 75,000
Annual Production 1 Units
Production Hrs. Annual 6,426
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $249,130 3,075,657 kWh $0.08
Electricity Demand $159,339 8,522 kW-months/year $18.70
Electricity Fees $12,647 - $ -
Natural Gas $25,627 2,801 MMBtu $9.15
TOTAL ENERGY COSTS $446,743
RECOMMENDED SAVINGS* $49,124 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,359
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$31,588
Cost:
-
- - $31,588 - -
-
kWh
$31,588
-
kW-months/year
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$5,480
Cost:
-
- - $5,480 - -
-
kWh
$5,480
-
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,840
Cost:
$2,200
$6,840 84,460 - - $6,840
84,460
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,765
Cost:
$2,554
$1,903 23,499 $862 46 $1,903
23,499
kWh
$862
46
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,451
Cost:
$4,146
$2,451 30,264 - - $2,451
30,264
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$49,124
Cost:
$8,900
$11,194 138,223 $37,930 46 $11,194
138,223
kWh
$37,930
46
kW-months/year
TOTAL IMPLEMENTED Savings:
$46,359
Cost:
$6,346
$9,291 114,724 $37,068 - $9,291
114,724
kWh
$37,068
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand