IAC logo
IAC Assessment: SD0432
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0432
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2011
Principal Product Noodles, Fortune cookies
NAICS 311824 - Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 35,000
Annual Production 8,500,000 Pounds
Production Hrs. Annual 7,488
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,677 1,226,080 kWh $0.08
Electricity Demand $42,316 3,398 kW-months/year $12.45
Electricity Fees $1,800 - $ -
Natural Gas $102,060 15,622 MMBtu $6.53
TOTAL ENERGY COSTS $244,853
RECOMMENDED SAVINGS* $11,909 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,502
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,239
Cost:
-
$1,239 15,391 - - - - $1,239
15,391
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$2,059
Cost:
$800
- - - - $2,059 315 -
-
kWh
-
-
kW-months/year
$2,059
315
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$214
Cost:
$100
$118 1,496 $96 8 - - $118
1,496
kWh
$96
8
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,412
Cost:
$800
$1,107 13,574 $305 25 - - $1,107
13,574
kWh
$305
25
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$204
Cost:
$427
$204 2,539 - - - - $204
2,539
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$3,408
Cost:
$8,000
$2,512 31,205 $896 72 - - $2,512
31,205
kWh
$896
72
kW-months/year
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,373
Cost:
$8,285
$3,373 41,895 - - - - $3,373
41,895
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$11,909
Cost:
$18,412
$8,553 106,100 $1,297 105 $2,059 315 $8,553
106,100
kWh
$1,297
105
kW-months/year
$2,059
315
MMBtu
TOTAL IMPLEMENTED Savings:
$3,502
Cost:
$1,227
$1,443 17,930 - - $2,059 315 $1,443
17,930
kWh
-
-
kW-months/year
$2,059
315
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas