IAC logo
IAC Assessment: SD0441
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0441
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2012
Principal Product Treated Waste Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4941 - Water Supply
Sales <$500,000
# of Employees 14
Plant Area (Sq.Ft.) 10,000
Annual Production 22 Units
Production Hrs. Annual 3,640
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,837,672 36,241,024 kWh $0.08
Electricity Demand $1,075,101 77,541 kW-months/year $13.86
Electricity Fees $(-90,329) - $ -
TOTAL ENERGY COSTS $3,822,444
RECOMMENDED SAVINGS* $42,492 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,754
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,647
Cost:
$100
$1,647 21,380 - - $1,647
21,380
kWh
-
-
kW-months/year
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$20,436
Cost:
$21,000
$20,436 261,000 - - $20,436
261,000
kWh
-
-
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,738
Cost:
$16,500
$15,738 201,000 - - $15,738
201,000
kWh
-
-
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,451
Cost:
$2,800
$2,451 31,300 - - $2,451
31,300
kWh
-
-
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,220
Cost:
$4,100
$1,790 22,860 $430 31 $1,790
22,860
kWh
$430
31
kW-months/year
TOTAL RECOMMENDED Savings:
$42,492
Cost:
$44,500
$42,062 537,540 $430 31 $42,062
537,540
kWh
$430
31
kW-months/year
TOTAL IMPLEMENTED Savings:
$26,754
Cost:
$28,000
$26,324 336,540 $430 31 $26,324
336,540
kWh
$430
31
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand