IAC logo
IAC Assessment: SD0449
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0449
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2012
Principal Product candy
NAICS 445292 - Confectionery and Nut Stores
SIC 5441 - Candy, Nut, And Confectionery Stores
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 165,000
Annual Production 12,000,000 Pounds
Production Hrs. Annual 4,550
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $328,364 3,834,874 kWh $0.09
Electricity Demand $153,716 32,720 kW-months/year $4.70
Electricity Fees $71,049 - $ -
Natural Gas $112,765 16,215 MMBtu $6.95
TOTAL ENERGY COSTS $665,894
RECOMMENDED SAVINGS* $20,213 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,941
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,392
Cost:
$100
$4,392 51,310 - - - - - - $4,392
51,310
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$3,454
Cost:
$100
$3,017 35,247 $437 93 - - - - $3,017
35,247
kWh
$437
93
kW-months/year
-
-
$
-
-
MMBtu
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,042
Cost:
$200
- - - - - - $1,042 150 -
-
kWh
-
-
kW-months/year
-
-
$
$1,042
150
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$4,456
Cost:
$1,200
$3,892 45,467 $564 120 - - - - $3,892
45,467
kWh
$564
120
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,629
Cost:
$2,471
$1,629 19,035 - - - - - - $1,629
19,035
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$865
Cost:
$1,500
$1,052 12,285 $178 38 - - $(-364) (-52) $1,052
12,285
kWh
$178
38
kW-months/year
-
-
$
$(-364)
(-52)
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,186
Cost:
$2,022
$1,036 12,103 $150 32 - - - - $1,036
12,103
kWh
$150
32
kW-months/year
-
-
$
-
-
MMBtu
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,189
Cost:
$5,775
- - - - $3,189 - - - -
-
kWh
-
-
kW-months/year
$3,189
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$20,213
Cost:
$13,368
$15,018 175,447 $1,329 283 $3,189 - $678 97 $15,018
175,447
kWh
$1,329
283
kW-months/year
$3,189
-
$
$678
97
MMBtu
TOTAL IMPLEMENTED Savings:
$11,941
Cost:
$5,022
$10,372 121,165 $892 190 - - $678 97 $10,372
121,165
kWh
$892
190
kW-months/year
-
-
$
$678
97
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas