Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2012 |
Principal Product | Coated Sheet Steel |
NAICS | 331221 - Rolled Steel Shape Manufacturing |
SIC | 3316 - Cold Finishing Of Steel Shapes |
Sales | $100,000,000-$500,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 373,000 |
Annual Production | 41,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,362,959 | 56,087,080 | kWh | $0.04 |
Electricity Demand | $583,222 | 52,341 | kW-months/year | $11.14 |
Electricity Fees | $(-222,973) | - | $ | - |
Natural Gas | $1,808,440 | 738,614 | MMBtu | $2.45 |
TOTAL ENERGY COSTS | $4,531,648 | |||
RECOMMENDED SAVINGS* | $234,813 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $26,051 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,512 Cost: $200 |
$3,512 | 83,420 | - | - | - | - | - | - |
$3,512 83,420 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,236 Cost: $2,700 |
$5,977 | 141,965 | $2,259 | 203 | - | - | - | - |
$5,977 141,965 kWh |
$2,259 203 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS |
Savings: $6,156 Cost: $2,000 |
$4,467 | 106,105 | $1,689 | 152 | - | - | - | - |
$4,467 106,105 kWh |
$1,689 152 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $5,354 Cost: $2,350 |
$3,372 | 80,086 | $1,982 | 178 | - | - | - | - |
$3,372 80,086 kWh |
$1,982 178 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $14,303 Cost: $13,546 |
- | - | - | - | $14,303 | 5,843 | - | - |
- - kWh |
- - kW-months/year |
$14,303 5,843 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $3,826 Cost: $6,000 |
- | - | - | - | $3,826 | 1,563 | - | - |
- - kWh |
- - kW-months/year |
$3,826 1,563 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2693 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION |
Savings: $28,169 Cost: $55,000 |
$18,418 | 437,478 | $9,751 | 875 | - | - | - | - |
$18,418 437,478 kWh |
$9,751 875 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $14,363 Cost: $31,050 |
$11,100 | 263,656 | $3,263 | 293 | - | - | - | - |
$11,100 263,656 kWh |
$3,263 293 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR |
Savings: $148,802 Cost: $420,000 |
$137,528 | 3,266,693 | $54,608 | 4,902 | - | - | $(-43,334) | - |
$137,528 3,266,693 kWh |
$54,608 4,902 kW-months/year |
- - MMBtu |
$(-43,334) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,092 Cost: $5,992 |
$1,518 | 36,060 | $574 | 52 | - | - | - | - |
$1,518 36,060 kWh |
$574 52 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $234,813 Cost: $538,838 |
$185,892 | 4,415,463 | $74,126 | 6,654 | $18,129 | 7,406 | $(-43,334) | - | $185,892 4,415,463 kWh |
$74,126 6,654 kW-months/year |
$18,129 7,406 MMBtu |
$(-43,334) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $26,051 Cost: $16,446 |
$9,489 | 225,385 | $2,259 | 203 | $14,303 | 5,843 | - | - | $9,489 225,385 kWh |
$2,259 203 kW-months/year |
$14,303 5,843 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||