Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2013 |
Principal Product | Carpet Padding |
NAICS | 326150 - Urethane and Other Foam Product (except Polystyrene) Manufacturing |
SIC | 3086 - Plastics Foam Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 217,156 |
Annual Production | 430,000 Pieces |
Production Hrs. Annual | 5,500 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $259,968 | 3,349,113 | kWh | $0.08 |
Electricity Demand | $231,981 | 11,917 | kW-months/year | $19.47 |
Electricity Fees | $8,947 | - | $ | - |
Natural Gas | $41,537 | 6,478 | MMBtu | $6.41 |
TOTAL ENERGY COSTS | $542,433 | |||
RECOMMENDED SAVINGS* | $48,592 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $42,172 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $24,055 Cost: $56,924 |
$12,995 | 167,455 | $7,114 | 365 | $3,946 | 615 |
$12,995 167,455 kWh |
$7,114 365 kW-months/year |
$3,946 615 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $7,483 Cost: $12,710 |
$4,981 | 64,183 | $2,502 | 129 | - | - |
$4,981 64,183 kWh |
$2,502 129 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,612 Cost: $500 |
$3,155 | 40,650 | $457 | 23 | - | - |
$3,155 40,650 kWh |
$457 23 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,318 Cost: $6,100 |
$1,516 | 19,539 | $2,336 | 120 | $(-534) | (-83) |
$1,516 19,539 kWh |
$2,336 120 kW-months/year |
$(-534) (-83) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $2,867 Cost: $200 |
- | - | - | - | $2,867 | 447 |
- - kWh |
- - kW-months/year |
$2,867 447 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,309 Cost: $200 |
$1,581 | 20,377 | $728 | 37 | - | - |
$1,581 20,377 kWh |
$728 37 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,888 Cost: $400 |
$1,888 | 24,326 | - | - | - | - |
$1,888 24,326 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $1,846 Cost: $2,628 |
$1,229 | 15,835 | $617 | 32 | - | - |
$1,229 15,835 kWh |
$617 32 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,214 Cost: $2,058 |
- | - | - | - | $1,214 | 177 |
- - kWh |
- - kW-months/year |
$1,214 177 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $48,592 Cost: $81,720 |
$27,345 | 352,365 | $13,754 | 706 | $7,493 | 1,156 | $27,345 352,365 kWh |
$13,754 706 kW-months/year |
$7,493 1,156 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $42,172 Cost: $73,162 |
$23,941 | 308,500 | $11,418 | 586 | $6,813 | 1,063 | $23,941 308,500 kWh |
$11,418 586 kW-months/year |
$6,813 1,063 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |