Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2013 |
Principal Product | vegetables |
NAICS | 424480 - Fresh Fruit and Vegetable Merchant Wholesalers |
SIC | 5148 - Fresh Fruits And Vegetables |
Sales | $10,000,000-$50,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 71,000 |
Annual Production | 10,000,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $283,282 | 4,128,415 | kWh | $0.07 |
Electricity Demand | $147,583 | 7,970 | kW-months/year | $18.52 |
Natural Gas | $1,328 | 149 | MMBtu | $8.92 |
TOTAL ENERGY COSTS | $432,193 | |||
RECOMMENDED SAVINGS* | $110,882 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,671 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $37,421 Cost: $53,250 |
$37,421 | 545,502 | - | - | - | - | - | - |
$37,421 545,502 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $23,156 Cost: $8,740 |
$16,904 | 246,415 | $6,252 | 338 | - | - | - | - |
$16,904 246,415 kWh |
$6,252 338 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $15,384 Cost: $50,200 |
$12,982 | 189,247 | $2,402 | 130 | - | - | - | - |
$12,982 189,247 kWh |
$2,402 130 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $10,246 Cost: $10,350 |
$8,646 | 126,013 | $1,600 | 86 | - | - | - | - |
$8,646 126,013 kWh |
$1,600 86 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $10,014 Cost: $15,500 |
$3,775 | 55,022 | $8,210 | 443 | $(-1,971) | (-221) | - | - |
$3,775 55,022 kWh |
$8,210 443 kW-months/year |
$(-1,971) (-221) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $7,769 Cost: $7,320 |
$7,769 | 113,247 | - | - | - | - | - | - |
$7,769 113,247 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $3,825 Cost: $1,500 |
- | - | $1,672 | 97 | - | - | $2,153 | - |
- - kWh |
$1,672 97 kW-months/year |
- - MMBtu |
$2,153 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,817 Cost: $600 |
$1,817 | 26,488 | - | - | - | - | - | - |
$1,817 26,488 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,250 Cost: $200 |
$1,142 | 16,644 | $108 | 6 | - | - | - | - |
$1,142 16,644 kWh |
$108 6 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $110,882 Cost: $147,660 |
$90,456 | 1,318,578 | $20,244 | 1,100 | $(-1,971) | (-221) | $2,153 | - | $90,456 1,318,578 kWh |
$20,244 1,100 kW-months/year |
$(-1,971) (-221) MMBtu |
$2,153 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,671 Cost: $53,450 |
$38,563 | 562,146 | $108 | 6 | - | - | - | - | $38,563 562,146 kWh |
$108 6 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |