IAC logo
IAC Assessment: SD0469
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0469
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2013
Principal Product vegetables
NAICS 424480 - Fresh Fruit and Vegetable Merchant Wholesalers
SIC 5148 - Fresh Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 71,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $283,282 4,128,415 kWh $0.07
Electricity Demand $147,583 7,970 kW-months/year $18.52
Natural Gas $1,328 149 MMBtu $8.92
TOTAL ENERGY COSTS $432,193
RECOMMENDED SAVINGS* $110,882 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,671
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$37,421
Cost:
$53,250
$37,421 545,502 - - - - - - $37,421
545,502
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$23,156
Cost:
$8,740
$16,904 246,415 $6,252 338 - - - - $16,904
246,415
kWh
$6,252
338
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$15,384
Cost:
$50,200
$12,982 189,247 $2,402 130 - - - - $12,982
189,247
kWh
$2,402
130
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,246
Cost:
$10,350
$8,646 126,013 $1,600 86 - - - - $8,646
126,013
kWh
$1,600
86
kW-months/year
-
-
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,014
Cost:
$15,500
$3,775 55,022 $8,210 443 $(-1,971) (-221) - - $3,775
55,022
kWh
$8,210
443
kW-months/year
$(-1,971)
(-221)
MMBtu
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,769
Cost:
$7,320
$7,769 113,247 - - - - - - $7,769
113,247
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$3,825
Cost:
$1,500
- - $1,672 97 - - $2,153 - -
-
kWh
$1,672
97
kW-months/year
-
-
MMBtu
$2,153
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,817
Cost:
$600
$1,817 26,488 - - - - - - $1,817
26,488
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,250
Cost:
$200
$1,142 16,644 $108 6 - - - - $1,142
16,644
kWh
$108
6
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$110,882
Cost:
$147,660
$90,456 1,318,578 $20,244 1,100 $(-1,971) (-221) $2,153 - $90,456
1,318,578
kWh
$20,244
1,100
kW-months/year
$(-1,971)
(-221)
MMBtu
$2,153
-
$
TOTAL IMPLEMENTED Savings:
$38,671
Cost:
$53,450
$38,563 562,146 $108 6 - - - - $38,563
562,146
kWh
$108
6
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes