Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2014 |
Principal Product | Beer |
NAICS | 312120 - Breweries |
SIC | 2082 - Malt Beverages |
Sales | $100,000,000-$500,000,000 |
# of Employees | 500 |
Plant Area (Sq.Ft.) | 660,000 |
Annual Production | 6,000,000 BBL |
Production Hrs. Annual | 8,760 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,798,079 | 29,335,034 | kWh | $0.06 |
Electricity Fees | $743,731 | - | $ | - |
Natural Gas | $2,273,337 | 1,066,915 | MMBtu | $2.13 |
TOTAL ENERGY COSTS | $4,815,147 | |||
RECOMMENDED SAVINGS* | $266,514 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $243,755 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | By-product Production | Electricity Usage | Natural Gas | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2624 USE COLD WASTE WATER TO COOL CHILLER FEED WATER |
Savings: $134,111 Cost: $80,720 |
$134,111 | 2,187,780 | - | - | - | - |
$134,111 2,187,780 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $36,872 Cost: $91,000 |
$36,872 | 601,542 | - | - | - | - |
$36,872 601,542 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $31,839 Cost: $1,000 |
$31,839 | 519,397 | - | - | - | - |
$31,839 519,397 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM |
Savings: $22,759 Cost: $25,200 |
- | - | $22,759 | 10,685 | - | - |
- - kWh |
$22,759 10,685 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $15,116 Cost: $2,600 |
$15,116 | 246,582 | - | - | - | - |
$15,116 246,582 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS |
Savings: $14,877 Cost: $5,000 |
- | - | - | - | $14,877 | - |
- - kWh |
- - MMBtu |
$14,877 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $7,167 Cost: $16,320 |
$7,167 | 116,974 | - | - | - | - |
$7,167 116,974 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $2,220 Cost: $1,200 |
- | - | $2,220 | 1,042 | - | - |
- - kWh |
$2,220 1,042 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,553 Cost: $2,325 |
- | - | $1,553 | 729 | - | - |
- - kWh |
$1,553 729 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $266,514 Cost: $225,365 |
$225,105 | 3,672,275 | $26,532 | 12,456 | $14,877 | - | $225,105 3,672,275 kWh |
$26,532 12,456 MMBtu |
$14,877 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $243,755 Cost: $200,165 |
$225,105 | 3,672,275 | $3,773 | 1,771 | $14,877 | - | $225,105 3,672,275 kWh |
$3,773 1,771 MMBtu |
$14,877 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | By-product Production | Electricity Usage | Natural Gas | By-product Production |