IAC Assessment: SD0483
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0483
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2014
Principal Product Furniture
NAICS 337124 - Metal Household Furniture Manufacturing
SIC 2514 - Metal Household Furniture
Sales $1,000,000-$5,000,000
# of Employees 240
Plant Area (Sq.Ft.) 200,645
Annual Production 106,000 Pieces
Production Hrs. Annual 2,168
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,346 1,161,152 kWh $0.07
Electricity Demand $88,061 4,622 kW-months/year $19.05
Electricity Fees $9,797 - $ -
Natural Gas $67,781 10,750 MMBtu $6.31
TOTAL ENERGY COSTS $251,985
RECOMMENDED SAVINGS* $36,746 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,638
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$18,026
Cost:
$61,400
$14,092 189,408 $3,934 207 - - $14,092
189,408
kWh
$3,934
207
kW-months/year
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,108
Cost:
$21,254
- - - - $7,108 1,130 -
-
kWh
-
-
kW-months/year
$7,108
1,130
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,486
Cost:
$2,845
- - - - $5,486 872 -
-
kWh
-
-
kW-months/year
$5,486
872
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,633
Cost:
$2,600
$2,633 35,390 - - - - $2,633
35,390
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,563
Cost:
$3,243
$(-395) (-5,306) $(-512) (-27) $2,470 393 $(-395)
(-5,306)
kWh
$(-512)
(-27)
kW-months/year
$2,470
393
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,147
Cost:
$500
$670 8,997 $477 25 - - $670
8,997
kWh
$477
25
kW-months/year
-
-
MMBtu
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$783
Cost:
$500
- - $783 50 - - -
-
kWh
$783
50
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$36,746
Cost:
$92,342
$17,000 228,489 $4,682 254 $15,064 2,395 $17,000
228,489
kWh
$4,682
254
kW-months/year
$15,064
2,395
MMBtu
TOTAL IMPLEMENTED Savings:
$29,638
Cost:
$71,088
$17,000 228,489 $4,682 254 $7,956 1,265 $17,000
228,489
kWh
$4,682
254
kW-months/year
$7,956
1,265
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas