IAC Assessment: SD0488
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0488
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2014
Principal Product Sheet Metal Components
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 73,000
Annual Production 800,001 Pieces
Production Hrs. Annual 3,063
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,435 1,311,274 kWh $0.10
Electricity Demand $50,308 4,619 kW-months/year $10.89
Electricity Fees $38,770 - $ -
Natural Gas $21,112 8,221 MMBtu $2.57
TOTAL ENERGY COSTS $240,625
RECOMMENDED SAVINGS* $27,435 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,043
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$7,838
Cost:
$7,262
$5,486 55,134 $2,352 216 $5,486
55,134
kWh
$2,352
216
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,362
Cost:
$2,700
$7,362 73,992 - - $7,362
73,992
kWh
-
-
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,081
Cost:
$14,125
$6,156 61,874 $925 85 $6,156
61,874
kWh
$925
85
kW-months/year
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,681
Cost:
$6,350
$3,922 39,419 $(-1,241) (-114) $3,922
39,419
kWh
$(-1,241)
(-114)
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,278
Cost:
$3,660
$1,154 11,602 $124 11 $1,154
11,602
kWh
$124
11
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,195
Cost:
$3,145
$984 9,890 $211 19 $984
9,890
kWh
$211
19
kW-months/year
TOTAL RECOMMENDED Savings:
$27,435
Cost:
$37,242
$25,064 251,911 $2,371 218 $25,064
251,911
kWh
$2,371
218
kW-months/year
TOTAL IMPLEMENTED Savings:
$10,043
Cost:
$9,050
$11,284 113,411 $(-1,241) (-114) $11,284
113,411
kWh
$(-1,241)
(-114)
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand