IAC logo
IAC Assessment: SD0497
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0497
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2015
Principal Product latex emulsion
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales <$500,000
# of Employees 40
Plant Area (Sq.Ft.) 196,200
Annual Production 80,001 Units
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $308,943 4,107,349 kWh $0.08
Electricity Demand $205,059 7,674 kW-months/year $26.72
Electricity Fees $40,433 - $ -
Natural Gas $117,425 15,302 MMBtu $7.67
TOTAL ENERGY COSTS $671,860
RECOMMENDED SAVINGS* $184,075 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$118,874
Cost:
$425,000
$114,844 2,080,500 $66,800 2,500 $(-62,770) (-8,718) $114,844
2,080,500
kWh
$66,800
2,500
kW-months/year
$(-62,770)
(-8,718)
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,403
Cost:
$14,111
$15,403 204,833 - - - - $15,403
204,833
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$15,039
Cost:
$2,275
$15,039 199,992 - - - - $15,039
199,992
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,837
Cost:
$1,500
$5,665 75,336 $3,172 119 - - $5,665
75,336
kWh
$3,172
119
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,591
Cost:
$14,085
$5,047 67,113 $2,544 95 - - $5,047
67,113
kWh
$2,544
95
kW-months/year
-
-
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,238
Cost:
$10,050
- - - - $7,238 1,005 -
-
kWh
-
-
kW-months/year
$7,238
1,005
MMBtu
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$6,323
Cost:
$1,580
$4,133 54,953 $2,190 82 - - $4,133
54,953
kWh
$2,190
82
kW-months/year
-
-
MMBtu
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,817
Cost:
$12,575
- - - - $3,817 530 -
-
kWh
-
-
kW-months/year
$3,817
530
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$953
Cost:
$1,745
$953 12,668 - - - - $953
12,668
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$184,075
Cost:
$482,921
$161,084 2,695,395 $74,706 2,796 $(-51,715) (-7,183) $161,084
2,695,395
kWh
$74,706
2,796
kW-months/year
$(-51,715)
(-7,183)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas