IAC Assessment: SD0498
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0498
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2015
Principal Product Corrugated paper boxes
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 43
Plant Area (Sq.Ft.) 245,000
Annual Production 80,001 Pieces
Production Hrs. Annual 4,160
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,811 1,642,073 kWh $0.08
Electricity Demand $75,710 4,664 kW-months/year $16.23
Electricity Fees $17,403 - $ -
Natural Gas $234,913 36,526 MMBtu $6.43
TOTAL ENERGY COSTS $453,837
RECOMMENDED SAVINGS* $46,005 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,247
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$14,239
Cost:
$1,000
- - - - $14,239 2,215 -
-
kWh
-
-
kW-months/year
$14,239
2,215
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$14,048
Cost:
$21,000
- - - - $14,048 2,185 -
-
kWh
-
-
kW-months/year
$14,048
2,185
MMBtu
03: 2.2162 REDUCE EXCESS STEAM BLEEDING Savings:
$10,701
Cost:
$14,842
- - - - $10,701 1,664 -
-
kWh
-
-
kW-months/year
$10,701
1,664
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,814
Cost:
$500
$1,746 22,797 $1,068 66 - - $1,746
22,797
kWh
$1,068
66
kW-months/year
-
-
MMBtu
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$3,194
Cost:
$8,000
- - - - $3,194 497 -
-
kWh
-
-
kW-months/year
$3,194
497
MMBtu
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,009
Cost:
$440
$788 10,250 $221 14 - - $788
10,250
kWh
$221
14
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$46,005
Cost:
$45,782
$2,534 33,047 $1,289 79 $42,182 6,560 $2,534
33,047
kWh
$1,289
79
kW-months/year
$42,182
6,560
MMBtu
TOTAL IMPLEMENTED Savings:
$20,247
Cost:
$9,500
$1,746 22,797 $1,068 66 $17,433 2,711 $1,746
22,797
kWh
$1,068
66
kW-months/year
$17,433
2,711
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas