Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2011 |
Principal Product | Explosive Ordinance |
NAICS | 332993 - Ammunition (except Small Arms) Manufacturing |
SIC | 3483 - Ammunition, Exc. For Small Arms, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 341 |
Plant Area (Sq.Ft.) | 125,904 |
Annual Production | 9,845,856 Pieces |
Production Hrs. Annual | 7,280 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,356,242 | 11,669,600 | kWh | $0.12 |
Electricity Demand | $74,074 | 26,936 | kW-months/year | $2.75 |
Electricity Fees | $40,691 | - | $ | - |
Natural Gas | $566,119 | 78,481 | MMBtu | $7.21 |
TOTAL ENERGY COSTS | $2,037,126 | |||
RECOMMENDED SAVINGS* | $63,354 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,022 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $6,430 Cost: - |
$6,430 | 55,335 | - | - | - | - |
$6,430 55,335 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $20,022 Cost: $2,400 |
$20,022 | 167,116 | - | - | - | - |
$20,022 167,116 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $11,899 Cost: $10,561 |
$11,517 | 99,115 | $382 | 12 | - | - |
$11,517 99,115 kWh |
$382 12 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $17,230 Cost: $18,098 |
$16,490 | 141,916 | $740 | 269 | - | - |
$16,490 141,916 kWh |
$740 269 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS |
Savings: $7,773 Cost: $17,794 |
$(-3,254) | (-28,007) | $(-104) | (-38) | $11,131 | 1,543 |
$(-3,254) (-28,007) kWh |
$(-104) (-38) kW-months/year |
$11,131 1,543 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $63,354 Cost: $48,853 |
$51,205 | 435,475 | $1,018 | 243 | $11,131 | 1,543 | $51,205 435,475 kWh |
$1,018 243 kW-months/year |
$11,131 1,543 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,022 Cost: $2,400 |
$20,022 | 167,116 | - | - | - | - | $20,022 167,116 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |