IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2011
Principal Product Compressors, Pumps, and Fans
NAICS 333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564 - Blowers And Fans
Sales $10,000,000-$50,000,000
# of Employees 91
Plant Area (Sq.Ft.) 54,000
Annual Production 10,000 Units
Production Hrs. Annual 3,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,511 792,502 kWh $0.08
Electricity Demand $35,341 2,299 kW-months/year $15.37
Electricity Fees $6,159 - $ -
Natural Gas $9,679 1,100 MMBtu $8.80
TOTAL ENERGY COSTS $117,690
RECOMMENDED SAVINGS* $60,137 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,565
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$5,207
Cost:
$100
$5,207 62,062 - - $5,207
62,062
kWh
-
-
kW-months/year
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,754
Cost:
$100
$1,754 20,907 - - $1,754
20,907
kWh
-
-
kW-months/year
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,193
Cost:
$300
$2,193 26,133 - - $2,193
26,133
kWh
-
-
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,354
Cost:
$1,440
$4,354 51,896 - - $4,354
51,896
kWh
-
-
kW-months/year
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,411
Cost:
$1,000
$1,411 16,823 - - $1,411
16,823
kWh
-
-
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$45,218
Cost:
$46,656
$30,770 366,748 $14,448 940 $30,770
366,748
kWh
$14,448
940
kW-months/year
TOTAL RECOMMENDED Savings:
$60,137
Cost:
$49,596
$45,689 544,569 $14,448 940 $45,689
544,569
kWh
$14,448
940
kW-months/year
TOTAL IMPLEMENTED Savings:
$10,565
Cost:
$1,500
$10,565 125,925 - - $10,565
125,925
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand