Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2015 |
Principal Product | Industrial Valves |
NAICS | 332911 - Industrial Valve Manufacturing |
SIC | 3462 - Iron And Steel Forgings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 320 Pieces |
Production Hrs. Annual | 4,420 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $120,856 | 1,567,781 | kWh | $0.08 |
Electricity Demand | $84,545 | 4,833 | kW-months/year | $17.49 |
Electricity Fees | $7,413 | - | $ | - |
TOTAL ENERGY COSTS | $212,814 | |||
RECOMMENDED SAVINGS* | $95,761 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $61,623 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $34,138 Cost: $61,820 |
$8,716 | 113,058 | $29,278 | 1,674 | - | - | $(-3,856) | (-482) |
$8,716 113,058 kWh |
$29,278 1,674 kW-months/year |
- - $ |
$(-3,856) (-482) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $39,697 Cost: $25,608 |
- | - | - | - | $39,697 | - | - | - |
- - kWh |
- - kW-months/year |
$39,697 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $9,185 Cost: $45,900 |
$6,224 | 80,727 | $2,961 | 169 | - | - | - | - |
$6,224 80,727 kWh |
$2,961 169 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,532 Cost: $800 |
$5,623 | 72,936 | $909 | 52 | - | - | - | - |
$5,623 72,936 kWh |
$909 52 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,224 Cost: $2,850 |
$3,224 | 41,769 | - | - | - | - | - | - |
$3,224 41,769 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,985 Cost: $5,247 |
$1,811 | 23,488 | $1,174 | 67 | - | - | - | - |
$1,811 23,488 kWh |
$1,174 67 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $95,761 Cost: $142,225 |
$25,598 | 331,978 | $34,322 | 1,962 | $39,697 | - | $(-3,856) | (-482) | $25,598 331,978 kWh |
$34,322 1,962 kW-months/year |
$39,697 - $ |
$(-3,856) (-482) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $61,623 Cost: $80,405 |
$16,882 | 218,920 | $5,044 | 288 | $39,697 | - | - | - | $16,882 218,920 kWh |
$5,044 288 kW-months/year |
$39,697 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |