IAC logo
IAC Assessment: SD0512
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0512
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2015
Principal Product Industrial Valves
NAICS 332911 - Industrial Valve Manufacturing
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 110,000
Annual Production 320 Pieces
Production Hrs. Annual 4,420
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $120,856 1,567,781 kWh $0.08
Electricity Demand $84,545 4,833 kW-months/year $17.49
Electricity Fees $7,413 - $ -
TOTAL ENERGY COSTS $212,814
RECOMMENDED SAVINGS* $95,761 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,623
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$34,138
Cost:
$61,820
$8,716 113,058 $29,278 1,674 - - $(-3,856) (-482) $8,716
113,058
kWh
$29,278
1,674
kW-months/year
-
-
$
$(-3,856)
(-482)
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$39,697
Cost:
$25,608
- - - - $39,697 - - - -
-
kWh
-
-
kW-months/year
$39,697
-
$
-
-
MMBtu
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$9,185
Cost:
$45,900
$6,224 80,727 $2,961 169 - - - - $6,224
80,727
kWh
$2,961
169
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,532
Cost:
$800
$5,623 72,936 $909 52 - - - - $5,623
72,936
kWh
$909
52
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,224
Cost:
$2,850
$3,224 41,769 - - - - - - $3,224
41,769
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,985
Cost:
$5,247
$1,811 23,488 $1,174 67 - - - - $1,811
23,488
kWh
$1,174
67
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$95,761
Cost:
$142,225
$25,598 331,978 $34,322 1,962 $39,697 - $(-3,856) (-482) $25,598
331,978
kWh
$34,322
1,962
kW-months/year
$39,697
-
$
$(-3,856)
(-482)
MMBtu
TOTAL IMPLEMENTED Savings:
$61,623
Cost:
$80,405
$16,882 218,920 $5,044 288 $39,697 - - - $16,882
218,920
kWh
$5,044
288
kW-months/year
$39,697
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas