IAC logo
IAC Assessment: SD0513
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0513
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2015
Principal Product Optical Glass
NAICS 327211 - Flat Glass Manufacturing
SIC 3211 - Flat Glass
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 150,000
Annual Production 10,000 Pieces
Production Hrs. Annual 6,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,240 2,593,421 kWh $0.04
Electricity Demand $67,590 4,608 kW-months/year $14.67
Electricity Fees $11,411 - $ -
TOTAL ENERGY COSTS $195,241
RECOMMENDED SAVINGS* $19,321 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$10,628
Cost:
$42,560
$3,679 82,149 $6,949 438 $3,679
82,149
kWh
$6,949
438
kW-months/year
02: 2.2514 COVER OPEN TANKS Savings:
$4,719
Cost:
$415
$3,531 78,820 $1,188 81 $3,531
78,820
kWh
$1,188
81
kW-months/year
03: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY Savings:
$1,873
Cost:
$200
$1,873 41,812 - - $1,873
41,812
kWh
-
-
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,240
Cost:
$2,500
$543 12,103 $697 48 $543
12,103
kWh
$697
48
kW-months/year
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$505
Cost:
$350
$505 11,271 - - $505
11,271
kWh
-
-
kW-months/year
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$356
Cost:
$72
$217 4,841 $139 10 $217
4,841
kWh
$139
10
kW-months/year
TOTAL RECOMMENDED Savings:
$19,321
Cost:
$46,097
$10,348 230,996 $8,973 576 $10,348
230,996
kWh
$8,973
576
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand