IAC Assessment: SD0515
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0515
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2015
Principal Product aircraft structures
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 1,150,000
Annual Production 50,000 Pieces
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,628,052 21,827,094 kWh $0.07
Electricity Demand $716,901 46,063 kW-months/year $15.56
Electricity Fees $169,215 - $ -
Natural Gas $218,442 31,217 MMBtu $7.00
TOTAL ENERGY COSTS $2,732,610
RECOMMENDED SAVINGS* $444,762 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$209,960
Cost:
$1,040,000
$210,385 3,853,200 $121,368 7,800 $(-121,793) (-17,399) $210,385
3,853,200
kWh
$121,368
7,800
kW-months/year
$(-121,793)
(-17,399)
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$163,675
Cost:
$32,788
$147,736 1,980,379 $75,061 4,824 $(-59,122) (-8,446) $147,736
1,980,379
kWh
$75,061
4,824
kW-months/year
$(-59,122)
(-8,446)
MMBtu
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$49,380
Cost:
$151,600
$32,173 431,281 $17,207 1,106 - - $32,173
431,281
kWh
$17,207
1,106
kW-months/year
-
-
MMBtu
04: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$9,105
Cost:
$25,000
$7,078 94,881 $2,027 130 - - $7,078
94,881
kWh
$2,027
130
kW-months/year
-
-
MMBtu
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$5,959
Cost:
$12,000
$5,959 79,886 - - - - $5,959
79,886
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,564
Cost:
$5,290
$2,317 31,037 $1,247 80 - - $2,317
31,037
kWh
$1,247
80
kW-months/year
-
-
MMBtu
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,240
Cost:
$1,550
$530 7,110 $710 46 - - $530
7,110
kWh
$710
46
kW-months/year
-
-
MMBtu
08: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$948
Cost:
$3,375
$(-569) (-7,622) $(-163) (-11) $1,680 240 $(-569)
(-7,622)
kWh
$(-163)
(-11)
kW-months/year
$1,680
240
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$931
Cost:
$3,050
$668 8,960 $263 17 - - $668
8,960
kWh
$263
17
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$444,762
Cost:
$1,274,653
$406,277 6,479,112 $217,720 13,992 $(-179,235) (-25,605) $406,277
6,479,112
kWh
$217,720
13,992
kW-months/year
$(-179,235)
(-25,605)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas