IAC logo
IAC Assessment: SD0522
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0522
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2016
Principal Product Fuel Metering Valves
NAICS 332911 - Industrial Valve Manufacturing
SIC 3491 - Industrial Valves
Sales <$500,000
# of Employees 85
Plant Area (Sq.Ft.) 34,000
Annual Production 80,001 Units
Production Hrs. Annual 2,338
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,236 484,688 kWh $0.19
Electricity Demand $65,872 1,775 kW-months/year $37.11
Electricity Fees $16,563 - $ -
TOTAL ENERGY COSTS $172,671
RECOMMENDED SAVINGS* $173,504 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $130,393
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$96,572
Cost:
$386,410
$71,545 384,235 $25,027 674 - - $71,545
384,235
kWh
$25,027
674
kW-months/year
-
-
$
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$31,891
Cost:
$46,500
$26,500 142,318 $5,391 145 - - $26,500
142,318
kWh
$5,391
145
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,341
Cost:
$22,524
$6,907 37,082 $7,209 194 $1,225 - $6,907
37,082
kWh
$7,209
194
kW-months/year
$1,225
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$11,220
Cost:
$21,500
$6,236 33,493 $4,984 134 - - $6,236
33,493
kWh
$4,984
134
kW-months/year
-
-
$
05: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$8,454
Cost:
$1,725
$4,179 22,445 $4,275 115 - - $4,179
22,445
kWh
$4,275
115
kW-months/year
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,109
Cost:
$1,101
$910 4,897 $4,199 113 - - $910
4,897
kWh
$4,199
113
kW-months/year
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,917
Cost:
$200
$4,917 26,409 - - - - $4,917
26,409
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$173,504
Cost:
$479,960
$121,194 650,879 $51,085 1,377 $1,225 - $121,194
650,879
kWh
$51,085
1,377
kW-months/year
$1,225
-
$
TOTAL IMPLEMENTED Savings:
$130,393
Cost:
$411,960
$88,458 475,068 $40,710 1,097 $1,225 - $88,458
475,068
kWh
$40,710
1,097
kW-months/year
$1,225
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost