IAC logo
IAC Assessment: SD0532
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0532
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2016
Principal Product Refined Oil Products
NAICS 324110 - Petroleum Refineries
SIC 2911 - Petroleum Refining
Sales $100,000,000-$500,000,000
# of Employees 75
Plant Area (Sq.Ft.) 340,000
Annual Production 125,000 Units
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,002,651 13,535,960 kWh $0.07
Electricity Demand $406,880 27,344 kW-months/year $14.88
Electricity Fees $19,224 - $ -
Natural Gas $635,642 734,494 MMBtu $0.87
TOTAL ENERGY COSTS $2,064,397
RECOMMENDED SAVINGS* $984,434 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$872,947
Cost:
$2,778,600
$659,573 12,191,730 $261,590 17,580 $(-48,216) (-55,420) $659,573
12,191,730
kWh
$261,590
17,580
kW-months/year
$(-48,216)
(-55,420)
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$46,280
Cost:
$13,575
- - - - $46,280 53,195 -
-
kWh
-
-
kW-months/year
$46,280
53,195
MMBtu
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$40,203
Cost:
$13,575
- - - - $40,203 46,210 -
-
kWh
-
-
kW-months/year
$40,203
46,210
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$13,093
Cost:
$1,200
$10,269 138,585 $2,824 190 - - $10,269
138,585
kWh
$2,824
190
kW-months/year
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,383
Cost:
$14,410
$7,328 98,890 $2,055 138 - - $7,328
98,890
kWh
$2,055
138
kW-months/year
-
-
MMBtu
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,528
Cost:
$1,000
- - - - $2,528 2,906 -
-
kWh
-
-
kW-months/year
$2,528
2,906
MMBtu
TOTAL RECOMMENDED Savings:
$984,434
Cost:
$2,822,360
$677,170 12,429,205 $266,469 17,908 $40,795 46,891 $677,170
12,429,205
kWh
$266,469
17,908
kW-months/year
$40,795
46,891
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas