IAC logo
IAC Assessment: SD0533
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0533
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2016
Principal Product Cosmetics and Personal Care PRoducts
NAICS 325620 - Toilet Preparation Manufacturing
SIC 2844 - Toilet Preparations
Sales $100,000,000-$500,000,000
# of Employees 750
Plant Area (Sq.Ft.) 220,000
Annual Production 1,000,000 Units
Production Hrs. Annual 4,845
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $152,498 1,888,014 kWh $0.08
Electricity Demand $136,613 5,297 kW-months/year $25.79
Electricity Fees $7,834 - $ -
Natural Gas $29,963 4,106 MMBtu $7.30
TOTAL ENERGY COSTS $326,908
RECOMMENDED SAVINGS* $107,410 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,084
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$65,643
Cost:
$292,000
$41,977 690,413 $46,422 1,800 - - $(-22,756) (-3,117) $41,977
690,413
kWh
$46,422
1,800
kW-months/year
-
-
$
$(-22,756)
(-3,117)
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,187
Cost:
$25,315
$9,173 113,539 $8,014 311 - - - - $9,173
113,539
kWh
$8,014
311
kW-months/year
-
-
$
-
-
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$11,672
Cost:
$7,800
$6,518 80,669 $5,154 200 - - - - $6,518
80,669
kWh
$5,154
200
kW-months/year
-
-
$
-
-
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,856
Cost:
$2,339
- - - - $4,856 - - - -
-
kWh
-
-
kW-months/year
$4,856
-
$
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,056
Cost:
$1,000
$1,692 20,939 $1,364 53 - - - - $1,692
20,939
kWh
$1,364
53
kW-months/year
-
-
$
-
-
MMBtu
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$2,827
Cost:
$5,600
$1,135 14,051 $1,692 66 - - - - $1,135
14,051
kWh
$1,692
66
kW-months/year
-
-
$
-
-
MMBtu
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,169
Cost:
$3,700
$2,006 24,819 $163 6 - - - - $2,006
24,819
kWh
$163
6
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$107,410
Cost:
$337,754
$62,501 944,430 $62,809 2,435 $4,856 - $(-22,756) (-3,117) $62,501
944,430
kWh
$62,809
2,435
kW-months/year
$4,856
-
$
$(-22,756)
(-3,117)
MMBtu
TOTAL IMPLEMENTED Savings:
$34,084
Cost:
$37,815
$19,389 239,966 $14,695 570 - - - - $19,389
239,966
kWh
$14,695
570
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas