Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2016 |
Principal Product | Steel Wire Drawing and Other Fabricated Wire Products |
NAICS | 332618 - Other Fabricated Wire Product Manufacturing |
SIC | 3315 - Steel Wire And Related Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 150 Units |
Production Hrs. Annual | 7,200 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $102,866 | 1,363,143 | kWh | $0.08 |
Electricity Demand | $93,723 | 3,710 | kW-months/year | $25.26 |
Electricity Fees | $7,363 | - | $ | - |
Natural Gas | $173,184 | 30,247 | MMBtu | $5.73 |
TOTAL ENERGY COSTS | $377,136 | |||
RECOMMENDED SAVINGS* | $144,781 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,365 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $91,093 Cost: $350,298 |
$68,332 | 1,231,200 | $54,562 | 2,160 | $(-31,801) | (-5,560) | - | - |
$68,332 1,231,200 kWh |
$54,562 2,160 kW-months/year |
$(-31,801) (-5,560) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $23,163 Cost: $68,259 |
- | - | - | - | $(-1,837) | (-321) | $25,000 | - |
- - kWh |
- - kW-months/year |
$(-1,837) (-321) MMBtu |
$25,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,468 Cost: $8,787 |
$4,682 | 62,007 | $2,786 | 110 | - | - | - | - |
$4,682 62,007 kWh |
$2,786 110 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $6,259 Cost: $11,760 |
$2,705 | 35,839 | $3,554 | 141 | - | - | - | - |
$2,705 35,839 kWh |
$3,554 141 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $5,594 Cost: $11,180 |
- | - | - | - | $5,594 | 980 | - | - |
- - kWh |
- - kW-months/year |
$5,594 980 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,995 Cost: $648 |
$2,184 | 28,927 | $811 | 32 | - | - | - | - |
$2,184 28,927 kWh |
$811 32 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $2,367 Cost: $3,700 |
$2,022 | 26,775 | $345 | 14 | - | - | - | - |
$2,022 26,775 kWh |
$345 14 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,796 Cost: $2,742 |
- | - | - | - | $1,796 | 314 | - | - |
- - kWh |
- - kW-months/year |
$1,796 314 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,472 Cost: $200 |
$1,472 | 19,496 | - | - | - | - | - | - |
$1,472 19,496 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,296 Cost: $3,200 |
$1,296 | 17,170 | - | - | - | - | - | - |
$1,296 17,170 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,278 Cost: $1,200 |
$768 | 10,174 | $510 | 20 | - | - | - | - |
$768 10,174 kWh |
$510 20 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $144,781 Cost: $461,974 |
$83,461 | 1,431,588 | $62,568 | 2,477 | $(-26,248) | (-4,587) | $25,000 | - | $83,461 1,431,588 kWh |
$62,568 2,477 kW-months/year |
$(-26,248) (-4,587) MMBtu |
$25,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,365 Cost: $7,790 |
$4,248 | 56,271 | $1,321 | 52 | $1,796 | 314 | - | - | $4,248 56,271 kWh |
$1,321 52 kW-months/year |
$1,796 314 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost |