Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2017
Principal Product Generic Liquid OTC Drug Products
NAICS 325411 - Medicinal and Botanical Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 240,000
Annual Production 8,000,000 Units
Production Hrs. Annual 6,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $226,649 3,073,333 kWh $0.07
Electricity Demand $172,816 8,773 kW-months/year $19.70
Electricity Fees $57,476 - $ -
Natural Gas $59,552 9,719 MMBtu $6.13
TOTAL ENERGY COSTS $516,493
RECOMMENDED SAVINGS* $36,538 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,314
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$14,252
Cost:
$40,625
$11,324 153,655 $2,928 149 $11,324
153,655
kWh
$2,928
149
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,279
Cost:
$33,276
$7,434 100,856 $3,845 195 $7,434
100,856
kWh
$3,845
195
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,972
Cost:
$8,850
$5,972 81,031 - - $5,972
81,031
kWh
-
-
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,536
Cost:
$6,060
$3,536 48,003 - - $3,536
48,003
kWh
-
-
kW-months/year
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$954
Cost:
$449
$759 10,298 $195 10 $759
10,298
kWh
$195
10
kW-months/year
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$545
Cost:
$914
$545 7,397 - - $545
7,397
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$36,538
Cost:
$90,174
$29,570 401,240 $6,968 354 $29,570
401,240
kWh
$6,968
354
kW-months/year
TOTAL IMPLEMENTED Savings:
$16,314
Cost:
$40,699
$12,274 166,554 $4,040 205 $12,274
166,554
kWh
$4,040
205
kW-months/year
Savings
Cost
$ kWh $ kW-months/year