IAC logo
IAC Assessment: SD0546
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0546
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2017
Principal Product Retail store metal products
NAICS 337215 - Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2542 - Partitions And Fixtures, Except Wood
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 128,700
Annual Production 80,001 Units
Production Hrs. Annual 2,470
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,600 569,775 kWh $0.09
Electricity Demand $60,803 3,203 kW-months/year $18.98
Electricity Fees $13,672 - $ -
Natural Gas $4,857 524 MMBtu $9.26
TOTAL ENERGY COSTS $128,932
RECOMMENDED SAVINGS* $27,283 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,283
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,392
Cost:
$25,659
$5,533 63,520 $5,859 309 $5,533
63,520
kWh
$5,859
309
kW-months/year
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$8,753
Cost:
$17,253
$7,552 86,703 $1,201 63 $7,552
86,703
kWh
$1,201
63
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,431
Cost:
$6,068
$4,431 50,871 - - $4,431
50,871
kWh
-
-
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,299
Cost:
$2,500
$1,299 14,916 - - $1,299
14,916
kWh
-
-
kW-months/year
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$989
Cost:
$400
$989 11,351 - - $989
11,351
kWh
-
-
kW-months/year
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$419
Cost:
$1,000
$419 4,809 - - $419
4,809
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$27,283
Cost:
$52,880
$20,223 232,170 $7,060 372 $20,223
232,170
kWh
$7,060
372
kW-months/year
TOTAL IMPLEMENTED Savings:
$27,283
Cost:
$52,880
$20,223 232,170 $7,060 372 $20,223
232,170
kWh
$7,060
372
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand