IAC Assessment: SD0568
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0568
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2018
Principal Product Windows and Doors
NAICS 332321 - Metal Window and Door Manufacturing
SIC 3442 - Metal Doors, Sash, And Trim
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 202,000
Annual Production 500,000 Units
Production Hrs. Annual 4,973
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,160 1,052,003 kWh $0.08
Electricity Demand $52,891 3,465 kW-months/year $15.26
Electricity Fees $3,013 - $ -
TOTAL ENERGY COSTS $140,064
RECOMMENDED SAVINGS* $4,619 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,485
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,647
Cost:
$2,000
$1,647 20,588 - - - - $1,647
20,588
kWh
-
-
kW-months/year
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,096
Cost:
-
$1,096 13,704 - - - - $1,096
13,704
kWh
-
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$742
Cost:
$3,292
$407 5,090 $313 21 $22 - $407
5,090
kWh
$313
21
kW-months/year
$22
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$659
Cost:
$2,850
$451 5,639 $208 14 - - $451
5,639
kWh
$208
14
kW-months/year
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$475
Cost:
$2,150
$475 5,936 - - - - $475
5,936
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$4,619
Cost:
$10,292
$4,076 50,957 $521 34 $22 - $4,076
50,957
kWh
$521
34
kW-months/year
$22
-
$
TOTAL IMPLEMENTED Savings:
$3,485
Cost:
$5,292
$3,150 39,382 $313 21 $22 - $3,150
39,382
kWh
$313
21
kW-months/year
$22
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost