Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2019
Principal Product Water Filtration Systems
NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3569 - General Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 134
Plant Area (Sq.Ft.) 128,000
Annual Production 1,000,000 Units
Production Hrs. Annual 2,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,459 1,040,570 kWh $0.03
Electricity Demand $52,030 2,883 kW-months/year $18.05
Electricity Fees $8,940 - $ -
Natural Gas $1,358 133 MMBtu $10.20
TOTAL ENERGY COSTS $96,787
RECOMMENDED SAVINGS* $28,476 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,659
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,259
Cost:
-
$1,259 13,988 - - - - - - $1,259
13,988
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$886
Cost:
$300
$805 8,940 $81 5 - - - - $805
8,940
kWh
$81
5
kW-months/year
-
-
$
-
-
$
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$485
Cost:
$1,290
$485 5,390 - - - - - - $485
5,390
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$332
Cost:
-
$332 3,688 - - - - - - $332
3,688
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$25,514
Cost:
$1,500
$35 370 $19 1 $12,960 - $12,500 - $35
370
kWh
$19
1
kW-months/year
$12,960
-
$
$12,500
-
$
TOTAL RECOMMENDED Savings:
$28,476
Cost:
$3,090
$2,916 32,376 $100 6 $12,960 - $12,500 - $2,916
32,376
kWh
$100
6
kW-months/year
$12,960
-
$
$12,500
-
$
TOTAL IMPLEMENTED Savings:
$27,659
Cost:
$1,800
$2,099 23,298 $100 6 $12,960 - $12,500 - $2,099
23,298
kWh
$100
6
kW-months/year
$12,960
-
$
$12,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Personnel Changes Primary Raw Material