IAC logo
IAC Assessment: SD0580
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0580
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2019
Principal Product Aerospace Components
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $100,000,000-$500,000,000
# of Employees 700
Plant Area (Sq.Ft.) 200,000
Annual Production 144,000 Units
Production Hrs. Annual 8,568
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,245,656 15,496,147 kWh $0.08
Electricity Demand $601,447 32,044 kW-months/year $18.77
Electricity Fees $25,509 - $ -
Natural Gas $70,152 11,754 MMBtu $5.97
TOTAL ENERGY COSTS $1,942,764
RECOMMENDED SAVINGS* $88,210 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $88,210
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$49,167
Cost:
$126,000
$38,979 484,810 $10,188 543 - - $38,979
484,810
kWh
$10,188
543
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$31,083
Cost:
$32,660
$22,498 279,831 $7,355 392 $1,230 - $22,498
279,831
kWh
$7,355
392
kW-months/year
$1,230
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,534
Cost:
-
$7,534 93,702 - - - - $7,534
93,702
kWh
-
-
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$426
Cost:
$450
$321 3,991 $105 6 - - $321
3,991
kWh
$105
6
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$88,210
Cost:
$159,110
$69,332 862,334 $17,648 941 $1,230 - $69,332
862,334
kWh
$17,648
941
kW-months/year
$1,230
-
$
TOTAL IMPLEMENTED Savings:
$88,210
Cost:
$159,110
$69,332 862,334 $17,648 941 $1,230 - $69,332
862,334
kWh
$17,648
941
kW-months/year
$1,230
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost