Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2019 |
Principal Product | Custom Manufactured Parts |
NAICS | 332710 - Machine Shops |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 47 |
Plant Area (Sq.Ft.) | 20,000 |
Annual Production | 260 Tons |
Production Hrs. Annual | 4,208 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $132,485 | 994,232 | kWh | $0.13 |
Electricity Demand | $82,897 | 2,440 | kW-months/year | $33.98 |
Electricity Fees | $290 | - | $ | - |
TOTAL ENERGY COSTS | $215,672 | |||
RECOMMENDED SAVINGS* | $64,226 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $42,166 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $22,060 Cost: $16,920 |
$22,060 | 165,491 | - | - | - | - |
$22,060 165,491 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $30,675 Cost: $66,500 |
$20,330 | 152,539 | $10,345 | 305 | - | - |
$20,330 152,539 kWh |
$10,345 305 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,834 Cost: $8,535 |
$3,148 | 23,605 | $2,624 | 77 | $62 | - |
$3,148 23,605 kWh |
$2,624 77 kW-months/year |
$62 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,649 Cost: $15,975 |
$2,692 | 20,198 | $1,957 | 58 | - | - |
$2,692 20,198 kWh |
$1,957 58 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,008 Cost: - |
$1,008 | 7,561 | - | - | - | - |
$1,008 7,561 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $64,226 Cost: $107,930 |
$49,238 | 369,394 | $14,926 | 439 | $62 | - | $49,238 369,394 kWh |
$14,926 439 kW-months/year |
$62 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $42,166 Cost: $91,010 |
$27,178 | 203,903 | $14,926 | 439 | $62 | - | $27,178 203,903 kWh |
$14,926 439 kW-months/year |
$62 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost |