IAC logo
IAC Assessment: SD0584
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0584
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2019
Principal Product Plastic Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 45,000
Annual Production 1 Units
Production Hrs. Annual 6,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,102 1,409,479 kWh $0.08
Electricity Demand $168,404 4,869 kW-months/year $34.59
Electricity Fees $8,947 - $ -
TOTAL ENERGY COSTS $283,453
RECOMMENDED SAVINGS* $7,586 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,175
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,249
Cost:
$11,435
$855 11,368 $1,394 40 $855
11,368
kWh
$1,394
40
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,045
Cost:
$300
$848 11,260 $197 6 $848
11,260
kWh
$197
6
kW-months/year
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,463
Cost:
$13,165
$812 10,777 $1,651 48 $812
10,777
kWh
$1,651
48
kW-months/year
04: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$810
Cost:
$1,204
$810 10,753 - - $810
10,753
kWh
-
-
kW-months/year
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$667
Cost:
-
$667 8,864 - - $667
8,864
kWh
-
-
kW-months/year
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$352
Cost:
-
$352 4,675 - - $352
4,675
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$7,586
Cost:
$26,104
$4,344 57,697 $3,242 94 $4,344
57,697
kWh
$3,242
94
kW-months/year
TOTAL IMPLEMENTED Savings:
$4,175
Cost:
$13,465
$2,327 30,901 $1,848 53 $2,327
30,901
kWh
$1,848
53
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand