Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2019 |
Principal Product | Windows and Doors |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 185,000 |
Annual Production | 286,800 Units |
Production Hrs. Annual | 5,720 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $262,098 | 3,745,477 | kWh | $0.07 |
Electricity Demand | $248,489 | 9,158 | kW-months/year | $27.13 |
Electricity Fees | $9,293 | - | $ | - |
Natural Gas | $29,312 | 3,812 | MMBtu | $7.69 |
Other Gas | $180 | 1 | MMBtu | $180.00 |
TOTAL ENERGY COSTS | $549,372 | |||
RECOMMENDED SAVINGS* | $97,018 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $95,075 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $57,437 Cost: $117,800 |
$39,565 | 565,228 | $17,872 | 659 | - | - |
$39,565 565,228 kWh |
$17,872 659 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $25,164 Cost: $24,783 |
$13,478 | 192,557 | $10,963 | 404 | $723 | - |
$13,478 192,557 kWh |
$10,963 404 kW-months/year |
$723 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,548 Cost: $17,875 |
$2,509 | 35,836 | $2,039 | 75 | - | - |
$2,509 35,836 kWh |
$2,039 75 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,460 Cost: - |
$2,460 | 35,139 | - | - | - | - |
$2,460 35,139 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,882 Cost: $330 |
$1,882 | 26,879 | - | - | - | - |
$1,882 26,879 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $1,834 Cost: $2,795 |
$1,834 | 26,201 | - | - | - | - |
$1,834 26,201 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,750 Cost: $350 |
$1,750 | 24,999 | - | - | - | - |
$1,750 24,999 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,943 Cost: $750 |
$1,599 | 22,781 | $344 | 13 | - | - |
$1,599 22,781 kWh |
$344 13 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $97,018 Cost: $164,683 |
$65,077 | 929,620 | $31,218 | 1,151 | $723 | - | $65,077 929,620 kWh |
$31,218 1,151 kW-months/year |
$723 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $95,075 Cost: $163,933 |
$63,478 | 906,839 | $30,874 | 1,138 | $723 | - | $63,478 906,839 kWh |
$30,874 1,138 kW-months/year |
$723 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost |