IAC logo
IAC Assessment: SD0590
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0590
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2019
Principal Product Plastic Containers
NAICS 326112 - Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $10,000,000-$50,000,000
# of Employees 42
Plant Area (Sq.Ft.) 25,000
Annual Production 9,500,000 Units
Production Hrs. Annual 7,776
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $541,683 5,128,830 kWh $0.11
Electricity Demand $221,099 11,450 kW-months/year $19.31
Electricity Fees $33,356 - $ -
TOTAL ENERGY COSTS $796,138
RECOMMENDED SAVINGS* $15,148 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,147
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$12,001
Cost:
$8,840
$8,288 78,479 $3,713 192 $8,288
78,479
kWh
$3,713
192
kW-months/year
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,948
Cost:
-
$1,948 18,450 - - $1,948
18,450
kWh
-
-
kW-months/year
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$880
Cost:
$120
$683 6,468 $197 10 $683
6,468
kWh
$197
10
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$319
Cost:
$585
$319 3,023 - - $319
3,023
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$15,148
Cost:
$9,545
$11,238 106,420 $3,910 203 $11,238
106,420
kWh
$3,910
203
kW-months/year
TOTAL IMPLEMENTED Savings:
$3,147
Cost:
$705
$2,950 27,941 $197 10 $2,950
27,941
kWh
$197
10
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand