IAC logo
IAC Assessment: SD0594
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0594
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2020
Principal Product Industrial Machinery
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 110,000
Annual Production 1,000 Pieces
Production Hrs. Annual 7,488
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $329,709 2,341,357 kWh $0.14
Electricity Demand $104,634 7,612 kW-months/year $13.75
Electricity Fees $7,586 - $ -
TOTAL ENERGY COSTS $441,929
RECOMMENDED SAVINGS* $57,192 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$12,740
Cost:
$8,700
$11,952 84,887 $788 57 - - - - $11,952
84,887
kWh
$788
57
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,323
Cost:
$11,533
$12,040 85,512 $1,885 137 - - $398 - $12,040
85,512
kWh
$1,885
137
kW-months/year
-
-
$
$398
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,863
Cost:
-
$4,863 34,541 - - - - - - $4,863
34,541
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$25,266
Cost:
-
- - - - $25,266 - - - -
-
kWh
-
-
kW-months/year
$25,266
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$57,192
Cost:
$20,233
$28,855 204,940 $2,673 194 $25,266 - $398 - $28,855
204,940
kWh
$2,673
194
kW-months/year
$25,266
-
$
$398
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost