Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2020 |
Principal Product | Drums |
NAICS | 332439 - Other Metal Container Manufacturing |
SIC | 3429 - Hardware, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 38,000 |
Annual Production | 300,000 Units |
Production Hrs. Annual | 2,678 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $47,274 | 517,632 | kWh | $0.09 |
Electricity Demand | $56,617 | 3,797 | kW-months/year | $14.91 |
Electricity Fees | $2,381 | - | $ | - |
Natural Gas | $68,359 | 9,309 | MMBtu | $7.34 |
TOTAL ENERGY COSTS | $174,631 | |||
RECOMMENDED SAVINGS* | $10,414 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,406 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,029 Cost: $300 |
$1,486 | 16,294 | $543 | 37 | - | - | - | - |
$1,486 16,294 kWh |
$543 37 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $629 Cost: - |
$629 | 6,889 | - | - | - | - | - | - |
$629 6,889 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $679 Cost: $1,983 |
$380 | 4,159 | $277 | 19 | - | - | $22 | - |
$380 4,159 kWh |
$277 19 kW-months/year |
- - MMBtu |
$22 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $5,799 Cost: $8,000 |
- | - | - | - | $5,799 | 790 | - | - |
- - kWh |
- - kW-months/year |
$5,799 790 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $727 Cost: $600 |
- | - | - | - | $727 | 99 | - | - |
- - kWh |
- - kW-months/year |
$727 99 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2514 COVER OPEN TANKS |
Savings: $551 Cost: $818 |
- | - | - | - | $551 | 75 | - | - |
- - kWh |
- - kW-months/year |
$551 75 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,414 Cost: $11,701 |
$2,495 | 27,342 | $820 | 55 | $7,077 | 964 | $22 | - | $2,495 27,342 kWh |
$820 55 kW-months/year |
$7,077 964 MMBtu |
$22 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,406 Cost: $2,583 |
$380 | 4,159 | $277 | 19 | $727 | 99 | $22 | - | $380 4,159 kWh |
$277 19 kW-months/year |
$727 99 MMBtu |
$22 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost |