Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2020 |
Principal Product | fabricated metal parts |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 42 |
Plant Area (Sq.Ft.) | 16,000 |
Annual Production | 13,500 Units |
Production Hrs. Annual | 4,250 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $32,642 | 406,600 | kWh | $0.08 |
Electricity Demand | $43,664 | 1,823 | kW-months/year | $23.95 |
TOTAL ENERGY COSTS | $76,306 | |||
RECOMMENDED SAVINGS* | $3,673 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $931 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,874 Cost: $2,784 |
$986 | 12,295 | $833 | 35 | $55 | - |
$986 12,295 kWh |
$833 35 kW-months/year |
$55 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $868 Cost: $693 |
$868 | 10,812 | - | - | - | - |
$868 10,812 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $688 Cost: $150 |
$484 | 6,023 | $204 | 9 | - | - |
$484 6,023 kWh |
$204 9 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $243 Cost: - |
$243 | 3,020 | - | - | - | - |
$243 3,020 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $3,673 Cost: $3,627 |
$2,581 | 32,150 | $1,037 | 43 | $55 | - | $2,581 32,150 kWh |
$1,037 43 kW-months/year |
$55 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $931 Cost: $150 |
$727 | 9,043 | $204 | 9 | - | - | $727 9,043 kWh |
$204 9 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost |