IAC logo
IAC Assessment: SD0602
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0602
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2020
Principal Product Tempered Glass
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 43
Plant Area (Sq.Ft.) 50,000
Annual Production 425,000 Units
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $152,481 1,166,280 kWh $0.13
Electricity Demand $65,798 4,618 kW-months/year $14.25
Electricity Fees $28,492 - $ -
TOTAL ENERGY COSTS $246,771
RECOMMENDED SAVINGS* $85,848 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,898
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$3,957
Cost:
$7,500
$3,236 24,760 $721 51 - - $3,236
24,760
kWh
$721
51
kW-months/year
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,346
Cost:
$568
$1,940 14,840 $406 29 - - $1,940
14,840
kWh
$406
29
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,898
Cost:
$2,500
$5,339 40,841 $559 39 - - $5,339
40,841
kWh
$559
39
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,430
Cost:
$10,300
$2,836 21,700 $594 42 - - $2,836
21,700
kWh
$594
42
kW-months/year
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,177
Cost:
-
$1,534 11,737 $643 45 - - $1,534
11,737
kWh
$643
45
kW-months/year
-
-
$
06: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$68,040
Cost:
$68,000
- - - - $68,040 - -
-
kWh
-
-
kW-months/year
$68,040
-
$
TOTAL RECOMMENDED Savings:
$85,848
Cost:
$88,868
$14,885 113,878 $2,923 205 $68,040 - $14,885
113,878
kWh
$2,923
205
kW-months/year
$68,040
-
$
TOTAL IMPLEMENTED Savings:
$5,898
Cost:
$2,500
$5,339 40,841 $559 39 - - $5,339
40,841
kWh
$559
39
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes