IAC logo
IAC Assessment: SD0606
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0606
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2021
Principal Product Lighting Products
NAICS 335121 - Residential Electric Lighting Fixture Manufacturing
SIC 3645 - Residential Lighting Fixtures
Sales $50,000,000-$100,000,000
# of Employees 270
Plant Area (Sq.Ft.) 430,000
Annual Production 500,000 Units
Production Hrs. Annual 7,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $251,683 2,727,985 kWh $0.09
Electricity Demand $161,398 6,284 kW-months/year $25.68
Electricity Fees $6,732 - $ -
TOTAL ENERGY COSTS $419,813
RECOMMENDED SAVINGS* $57,609 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,914
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$52,049
Cost:
$46,262
$34,581 374,635 $16,035 624 $1,433 - $34,581
374,635
kWh
$16,035
624
kW-months/year
$1,433
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,424
Cost:
$3,341
$1,967 21,312 $457 18 - - $1,967
21,312
kWh
$457
18
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,375
Cost:
$300
$1,116 12,096 $258 10 - - $1,116
12,096
kWh
$258
10
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,222
Cost:
$4,345
$773 8,379 $449 18 - - $773
8,379
kWh
$449
18
kW-months/year
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$539
Cost:
-
$539 5,838 - - - - $539
5,838
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$57,609
Cost:
$54,248
$38,976 422,260 $17,199 670 $1,433 - $38,976
422,260
kWh
$17,199
670
kW-months/year
$1,433
-
$
TOTAL IMPLEMENTED Savings:
$1,914
Cost:
$300
$1,655 17,934 $258 10 - - $1,655
17,934
kWh
$258
10
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost