IAC logo
IAC Assessment: SD0622
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0622
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2021
Principal Product Sheet and Plate metal components
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 42
Plant Area (Sq.Ft.) 30,000
Annual Production 600,000 Units
Production Hrs. Annual 3,825
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $67,112 106,955 kWh $0.63
Electricity Demand $73,634 1,418 kW-months/year $51.93
Electricity Fees $1,520 - $ -
TOTAL ENERGY COSTS $142,266
RECOMMENDED SAVINGS* $30,460 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,056
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,131
Cost:
$800
$8,967 14,290 $1,164 22 - - $8,967
14,290
kWh
$1,164
22
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,925
Cost:
$6,341
$7,860 12,525 $2,035 39 $30 - $7,860
12,525
kWh
$2,035
39
kW-months/year
$30
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,372
Cost:
$8,800
$4,719 7,520 $1,653 32 - - $4,719
7,520
kWh
$1,653
32
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,032
Cost:
-
$4,032 6,426 - - - - $4,032
6,426
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$30,460
Cost:
$15,941
$25,578 40,761 $4,852 93 $30 - $25,578
40,761
kWh
$4,852
93
kW-months/year
$30
-
$
TOTAL IMPLEMENTED Savings:
$20,056
Cost:
$7,141
$16,827 26,815 $3,199 62 $30 - $16,827
26,815
kWh
$3,199
62
kW-months/year
$30
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees