IAC logo
IAC Assessment: SD0624
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0624
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2023
Principal Product Steel fabricated racks, cabinets, accessories for Data Center, IT infrastructure
NAICS 331110 - Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3399 - Primary Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 225
Plant Area (Sq.Ft.) 100,000
Annual Production 100,000 Units
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $187,218 1,349,508 kWh $0.14
Electricity Demand $118,035 2,886 kW-months/year $40.90
Electricity Fees $14,838 - $ -
Natural Gas $450,444 31,188 MMBtu $14.44
TOTAL ENERGY COSTS $770,535
RECOMMENDED SAVINGS* $21,674 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,075
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,107
Cost:
$5,169
$1,229 8,862 $878 21 - - - - $1,229
8,862
kWh
$878
21
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,290
Cost:
$1,500
$3,795 27,330 $495 12 - - - - $3,795
27,330
kWh
$495
12
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,718
Cost:
$11,910
- - - - $8,718 606 - - -
-
kWh
-
-
kW-months/year
$8,718
606
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,715
Cost:
$1,161
$1,209 8,721 $506 12 - - - - $1,209
8,721
kWh
$506
12
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$998
Cost:
$4,300
$628 4,530 $370 9 - - - - $628
4,530
kWh
$370
9
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,070
Cost:
$828
$659 4,752 $389 9 - - $22 - $659
4,752
kWh
$389
9
kW-months/year
-
-
MMBtu
$22
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,776
Cost:
$7,884
- - - - $2,776 192 - - -
-
kWh
-
-
kW-months/year
$2,776
192
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$21,674
Cost:
$32,752
$7,520 54,195 $2,638 63 $11,494 798 $22 - $7,520
54,195
kWh
$2,638
63
kW-months/year
$11,494
798
MMBtu
$22
-
$
TOTAL IMPLEMENTED Savings:
$7,075
Cost:
$3,489
$5,663 40,803 $1,390 33 - - $22 - $5,663
40,803
kWh
$1,390
33
kW-months/year
-
-
MMBtu
$22
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost