IAC logo
IAC Assessment: SD0626
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0626
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2023
Principal Product Antibodies, Cell Therapies
NAICS 325414 - Biological Product (except Diagnostic) Manufacturing
SIC 2836 - Biological Products Exc. Diagnostic
Sales $10,000,000-$50,000,000
# of Employees 241
Plant Area (Sq.Ft.) 115,000
Annual Production 100,000 Units
Production Hrs. Annual 2,295
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $636,314 5,375,675 kWh $0.12
Electricity Demand $606,729 22,558 kW-months/year $26.90
Electricity Fees $(-4,214) - $ -
Natural Gas $277,087 21,391 MMBtu $12.95
TOTAL ENERGY COSTS $1,515,916
RECOMMENDED SAVINGS* $238,831 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$54,888
Cost:
$228,599
$22,087 201,705 $32,801 1,356 - - - - $22,087
201,705
kWh
$32,801
1,356
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,022
Cost:
$3,456
$464 3,442 $558 18 - - - - $464
3,442
kWh
$558
18
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,114
Cost:
$4,352
$1,470 13,421 $1,614 67 $30 - - - $1,470
13,421
kWh
$1,614
67
kW-months/year
$30
-
$
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,642
Cost:
$5,868
$752 6,163 $890 32 - - - - $752
6,163
kWh
$890
32
kW-months/year
-
-
$
-
-
MMBtu
05: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$90,974
Cost:
$2,500
$90,974 534,161 - - - - - - $90,974
534,161
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$87,191
Cost:
$2,500
- - - - - - $87,191 6,686 -
-
kWh
-
-
kW-months/year
-
-
$
$87,191
6,686
MMBtu
TOTAL RECOMMENDED Savings:
$238,831
Cost:
$247,275
$115,747 758,892 $35,863 1,473 $30 - $87,191 6,686 $115,747
758,892
kWh
$35,863
1,473
kW-months/year
$30
-
$
$87,191
6,686
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas