IAC logo
IAC Assessment: SD0631
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0631
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2023
Principal Product Dripline, Gardening Tubing
NAICS 333111 - Farm Machinery and Equipment Manufacturing
SIC 3523 - Farm Machinery And Equipment
Sales $10,000,000-$50,000,000
# of Employees 43
Plant Area (Sq.Ft.) 40,320
Annual Production 17,276,000 Units
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,149 814,464 kWh $0.24
Electricity Demand $72,622 3,503 kW-months/year $20.73
Electricity Fees $2,704 - $ -
TOTAL ENERGY COSTS $272,475
RECOMMENDED SAVINGS* $36,236 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $754
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,583
Cost:
$10,494
$2,133 8,804 $450 22 $2,133
8,804
kWh
$450
22
kW-months/year
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$15,108
Cost:
$70,650
$(-2,445) (-10,100) $17,553 847 $(-2,445)
(-10,100)
kWh
$17,553
847
kW-months/year
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$754
Cost:
$1,124
$754 3,116 - - $754
3,116
kWh
-
-
kW-months/year
04: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$3,553
Cost:
$3,535
$3,553 14,676 - - $3,553
14,676
kWh
-
-
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,208
Cost:
$16,000
$8,716 36,000 $1,492 72 $8,716
36,000
kWh
$1,492
72
kW-months/year
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$928
Cost:
$2,934
$780 3,222 $148 7 $780
3,222
kWh
$148
7
kW-months/year
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,509
Cost:
$4,973
$1,262 5,213 $247 12 $1,262
5,213
kWh
$247
12
kW-months/year
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,593
Cost:
$4,339
$1,507 6,225 $86 4 $1,507
6,225
kWh
$86
4
kW-months/year
TOTAL RECOMMENDED Savings:
$36,236
Cost:
$114,049
$16,260 67,156 $19,976 964 $16,260
67,156
kWh
$19,976
964
kW-months/year
TOTAL IMPLEMENTED Savings:
$754
Cost:
$1,124
$754 3,116 - - $754
3,116
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand