Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2023
Principal Product Heat Treated Aluminum Alloys
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $5,000,000-$10,000,000
# of Employees 53
Plant Area (Sq.Ft.) 38,000
Annual Production 200,000 Units
Production Hrs. Annual 6,732
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,525 1,166,425 kWh $0.04
Electricity Demand $71,563 2,673 kW-months/year $26.77
Electricity Fees $25,983 - $ -
Natural Gas $124,576 22,225 MMBtu $5.61
TOTAL ENERGY COSTS $269,647
RECOMMENDED SAVINGS* $187,547 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $118,921
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$77,202
Cost:
$252,463
$14,239 349,860 $62,963 2,352 - - - - $14,239
349,860
kWh
$62,963
2,352
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$57,958
Cost:
-
$(-1,793) (-44,051) $59,751 2,232 - - - - $(-1,793)
(-44,051)
kWh
$59,751
2,232
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,458
Cost:
$1,000
$307 7,544 $1,151 43 - - - - $307
7,544
kWh
$1,151
43
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$22,128
Cost:
$51,000
- - - - $22,128 3,944 - - -
-
kWh
-
-
kW-months/year
$22,128
3,944
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,668
Cost:
$37,853
$6,983 171,579 $7,791 291 $(-4,106) (-732) - - $6,983
171,579
kWh
$7,791
291
kW-months/year
$(-4,106)
(-732)
MMBtu
-
-
$
06: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$10,368
Cost:
-
- - - - $10,368 1,848 - - -
-
kWh
-
-
kW-months/year
$10,368
1,848
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$541
Cost:
$1,832
$261 6,420 $255 10 - - $25 - $261
6,420
kWh
$255
10
kW-months/year
-
-
MMBtu
$25
-
$
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$5,330
Cost:
$3,125
- - - - $5,330 950 - - -
-
kWh
-
-
kW-months/year
$5,330
950
MMBtu
-
-
$
09: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$1,894
Cost:
$3,900
$893 21,951 $1,001 37 - - - - $893
21,951
kWh
$1,001
37
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$187,547
Cost:
$351,173
$20,890 513,303 $132,912 4,965 $33,720 6,010 $25 - $20,890
513,303
kWh
$132,912
4,965
kW-months/year
$33,720
6,010
MMBtu
$25
-
$
TOTAL IMPLEMENTED Savings:
$118,921
Cost:
$313,320
$15,700 385,775 $65,370 2,442 $37,826 6,742 $25 - $15,700
385,775
kWh
$65,370
2,442
kW-months/year
$37,826
6,742
MMBtu
$25
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost