Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2023 |
Principal Product | Hot Isostatic Material Pressing. |
NAICS | 332710 - Machine Shops |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 39 |
Plant Area (Sq.Ft.) | 13,000 |
Annual Production | 10,000 Units |
Production Hrs. Annual | 6,120 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $127,560 | 1,344,505 | kWh | $0.09 |
Electricity Demand | $404,377 | 11,088 | kW-months/year | $36.47 |
Electricity Fees | $26,659 | - | $ | - |
TOTAL ENERGY COSTS | $1,057,139 | |||
RECOMMENDED SAVINGS* | $160,829 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $160,829 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $55,294 Cost: $90,412 |
$21,683 | 228,480 | $33,611 | 922 | - | - |
$21,683 228,480 kWh |
$33,611 922 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL |
Savings: $15,758 Cost: - |
$(-2,732) | (-28,793) | $18,490 | 507 | - | - |
$(-2,732) (-28,793) kWh |
$18,490 507 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $9,572 Cost: $31,410 |
$4,517 | 47,597 | $5,055 | 139 | - | - |
$4,517 47,597 kWh |
$5,055 139 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,271 Cost: $4,317 |
$781 | 8,226 | $490 | 13 | - | - |
$781 8,226 kWh |
$490 13 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,109 Cost: $18,901 |
$1,170 | 12,327 | $2,939 | 81 | - | - |
$1,170 12,327 kWh |
$2,939 81 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $5,370 Cost: $18,675 |
$684 | 7,209 | $4,686 | 129 | - | - |
$684 7,209 kWh |
$4,686 129 kW-months/year |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $69,455 Cost: $136,016 |
$(-10,454) | (-110,160) | $(-19,694) | (-540) | $99,603 | 229,500 |
$(-10,454) (-110,160) kWh |
$(-19,694) (-540) kW-months/year |
$99,603 229,500 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $160,829 Cost: $299,731 |
$15,649 | 164,886 | $45,577 | 1,250 | $99,603 | 229,500 | $15,649 164,886 kWh |
$45,577 1,250 kW-months/year |
$99,603 229,500 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $160,829 Cost: $299,731 |
$15,649 | 164,886 | $45,577 | 1,250 | $99,603 | 229,500 | $15,649 164,886 kWh |
$45,577 1,250 kW-months/year |
$99,603 229,500 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Other Liquid (non-haz) |