Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2024 |
Principal Product | Turbine Stators and Aircraft Parts |
NAICS | 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 280 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 15,000 Units |
Production Hrs. Annual | 6,900 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,976,397 | 6,187,528 | kWh | $0.32 |
Electricity Demand | $909,283 | 12,373 | kW-months/year | $73.49 |
Electricity Fees | $(-857,647) | - | $ | - |
TOTAL ENERGY COSTS | $2,028,033 | |||
RECOMMENDED SAVINGS* | $2,835,679 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $238,784 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Usage | Electricity Demand | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $22,994 Cost: $4,000 |
$22,994 | 71,990 | - | - |
$22,994 71,990 kWh |
- - kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,906 Cost: $4,828 |
$5,977 | 18,713 | $1,929 | 26 |
$5,977 18,713 kWh |
$1,929 26 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM |
Savings: $15,800 Cost: $12,200 |
$15,800 | 49,469 | - | - |
$15,800 49,469 kWh |
- - kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $113,272 Cost: $30,051 |
$85,296 | 267,050 | $27,976 | 381 |
$85,296 267,050 kWh |
$27,976 381 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $824,443 Cost: $529,751 |
$427,597 | 1,338,750 | $396,846 | 5,400 |
$427,597 1,338,750 kWh |
$396,846 5,400 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL |
Savings: $409,025 Cost: - |
$(-53,889) | (-168,718) | $462,914 | 6,299 |
$(-53,889) (-168,718) kWh |
$462,914 6,299 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $35,974 Cost: $2,600 |
$24,816 | 77,697 | $11,158 | 152 |
$24,816 77,697 kWh |
$11,158 152 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $14,384 Cost: $2,234 |
$10,831 | 33,911 | $3,553 | 48 |
$10,831 33,911 kWh |
$3,553 48 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $364,878 Cost: $49,250 |
- | - | $364,878 | 4,965 |
- - kWh |
$364,878 4,965 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $2,121 Cost: $10,016 |
$1,305 | 4,085 | $816 | 11 |
$1,305 4,085 kWh |
$816 11 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $41,340 Cost: $15,608 |
$31,130 | 97,463 | $10,210 | 139 |
$31,130 97,463 kWh |
$10,210 139 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $982,749 Cost: $783,575 |
$743,098 | 2,326,544 | $239,651 | 3,261 |
$743,098 2,326,544 kWh |
$239,651 3,261 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING |
Savings: $793 Cost: $1,336 |
$595 | 1,863 | $198 | 3 |
$595 1,863 kWh |
$198 3 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $2,835,679 Cost: $1,445,449 |
$1,315,550 | 4,118,817 | $1,520,129 | 20,685 | $1,315,550 4,118,817 kWh |
$1,520,129 20,685 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $238,784 Cost: $70,673 |
$182,944 | 572,772 | $55,840 | 760 | $182,944 572,772 kWh |
$55,840 760 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Usage | Electricity Demand |