IAC logo
IAC Assessment: SD0648
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0648
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2024
Principal Product Turbine Stators and Aircraft Parts
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 280
Plant Area (Sq.Ft.) 120,000
Annual Production 15,000 Units
Production Hrs. Annual 6,900
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,976,397 6,187,528 kWh $0.32
Electricity Demand $909,283 12,373 kW-months/year $73.49
Electricity Fees $(-857,647) - $ -
TOTAL ENERGY COSTS $2,028,033
RECOMMENDED SAVINGS* $2,835,679 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $238,784
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$22,994
Cost:
$4,000
$22,994 71,990 - - $22,994
71,990
kWh
-
-
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,906
Cost:
$4,828
$5,977 18,713 $1,929 26 $5,977
18,713
kWh
$1,929
26
kW-months/year
03: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$15,800
Cost:
$12,200
$15,800 49,469 - - $15,800
49,469
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$113,272
Cost:
$30,051
$85,296 267,050 $27,976 381 $85,296
267,050
kWh
$27,976
381
kW-months/year
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$824,443
Cost:
$529,751
$427,597 1,338,750 $396,846 5,400 $427,597
1,338,750
kWh
$396,846
5,400
kW-months/year
06: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$409,025
Cost:
-
$(-53,889) (-168,718) $462,914 6,299 $(-53,889)
(-168,718)
kWh
$462,914
6,299
kW-months/year
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$35,974
Cost:
$2,600
$24,816 77,697 $11,158 152 $24,816
77,697
kWh
$11,158
152
kW-months/year
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,384
Cost:
$2,234
$10,831 33,911 $3,553 48 $10,831
33,911
kWh
$3,553
48
kW-months/year
09: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$364,878
Cost:
$49,250
- - $364,878 4,965 -
-
kWh
$364,878
4,965
kW-months/year
10: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$2,121
Cost:
$10,016
$1,305 4,085 $816 11 $1,305
4,085
kWh
$816
11
kW-months/year
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$41,340
Cost:
$15,608
$31,130 97,463 $10,210 139 $31,130
97,463
kWh
$10,210
139
kW-months/year
12: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$982,749
Cost:
$783,575
$743,098 2,326,544 $239,651 3,261 $743,098
2,326,544
kWh
$239,651
3,261
kW-months/year
13: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$793
Cost:
$1,336
$595 1,863 $198 3 $595
1,863
kWh
$198
3
kW-months/year
TOTAL RECOMMENDED Savings:
$2,835,679
Cost:
$1,445,449
$1,315,550 4,118,817 $1,520,129 20,685 $1,315,550
4,118,817
kWh
$1,520,129
20,685
kW-months/year
TOTAL IMPLEMENTED Savings:
$238,784
Cost:
$70,673
$182,944 572,772 $55,840 760 $182,944
572,772
kWh
$55,840
760
kW-months/year
Savings
Cost
$ kWh $ kW-months/year