IAC Assessment: SD0654
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2024
Principal Product Automated Microelectronic Assembly Machines
NAICS 333242 - Semiconductor Machinery Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 67,528
Annual Production 45 Units
Production Hrs. Annual 4,335
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $275,767 875,919 kWh $0.31
Electricity Demand $185,991 2,351 kW-months/year $79.11
Electricity Fees $(-152,031) - $ -
Natural Gas $16,783 1,010 MMBtu $16.62
TOTAL ENERGY COSTS $326,510
RECOMMENDED SAVINGS* $119,229 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,846
Cost:
$1,355
$1,083 3,440 $763 10 - - $1,083
3,440
kWh
$763
10
kW-months/year
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$51,545
Cost:
$70,429
$31,833 101,120 $19,712 249 - - $31,833
101,120
kWh
$19,712
249
kW-months/year
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$13,069
Cost:
$20,212
- - $13,069 165 - - -
-
kWh
$13,069
165
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$12,410
Cost:
$7,109
$12,410 39,423 - - - - $12,410
39,423
kWh
-
-
kW-months/year
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,314
Cost:
$4,469
$6,639 21,088 $4,675 59 - - $6,639
21,088
kWh
$4,675
59
kW-months/year
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,573
Cost:
$12,716
$15,142 48,101 $10,339 131 $92 - $15,142
48,101
kWh
$10,339
131
kW-months/year
$92
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,472
Cost:
$2,019
$2,325 7,387 $1,147 15 - - $2,325
7,387
kWh
$1,147
15
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$119,229
Cost:
$118,309
$69,432 220,559 $49,705 628 $92 - $69,432
220,559
kWh
$49,705
628
kW-months/year
$92
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product