IAC logo
IAC Assessment: SD0663
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0663
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2025
Principal Product Packaging
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $50,000,000-$100,000,000
# of Employees 80
Plant Area (Sq.Ft.) 129,911
Annual Production 100,000,000 Units
Production Hrs. Annual 4,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $374,245 1,960,139 kWh $0.19
Electricity Demand $489,061 7,182 kW-months/year $68.09
TOTAL ENERGY COSTS $863,306
RECOMMENDED SAVINGS* $1,079,411 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$672,356
Cost:
$643,693
$267,802 1,402,840 $404,554 5,941 $267,802
1,402,840
kWh
$404,554
5,941
kW-months/year
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$314,276
Cost:
$12,865
$(-26,953) (-141,189) $341,229 5,011 $(-26,953)
(-141,189)
kWh
$341,229
5,011
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,060
Cost:
$4,266
$4,721 24,730 $6,339 93 $4,721
24,730
kWh
$6,339
93
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,102
Cost:
$3,252
$3,911 20,489 $4,190 62 $3,911
20,489
kWh
$4,190
62
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$33,214
Cost:
$18,590
$9,442 49,460 $23,772 349 $9,442
49,460
kWh
$23,772
349
kW-months/year
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$12,191
Cost:
-
- - $12,191 179 -
-
kWh
$12,191
179
kW-months/year
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,623
Cost:
$500
$6,623 34,691 - - $6,623
34,691
kWh
-
-
kW-months/year
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,107
Cost:
$2,287
$534 2,797 $573 8 $534
2,797
kWh
$573
8
kW-months/year
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,465
Cost:
$3,200
$3,465 18,149 - - $3,465
18,149
kWh
-
-
kW-months/year
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,427
Cost:
$3,278
$3,103 16,252 $3,324 49 $3,103
16,252
kWh
$3,324
49
kW-months/year
11: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$10,593
Cost:
$35,000
$7,676 40,207 $2,917 43 $7,676
40,207
kWh
$2,917
43
kW-months/year
TOTAL RECOMMENDED Savings:
$1,079,411
Cost:
$726,931
$280,323 1,468,426 $799,089 11,736 $280,323
1,468,426
kWh
$799,089
11,736
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand