Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2025 |
Principal Product | Steel Tubing |
NAICS | 339112 - Surgical and Medical Instrument Manufacturing |
SIC | 3841 - Surgical And Medical Instruments |
Sales | $10,000,000-$50,000,000 |
# of Employees | 157 |
Plant Area (Sq.Ft.) | 76,319 |
Annual Production | 1,000 Units |
Production Hrs. Annual | 8,568 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $359,826 | 1,848,653 | kWh | $0.19 |
Electricity Demand | $184,993 | 3,700 | kW-months/year | $50.00 |
Electricity Fees | $5,150 | - | $ | - |
Natural Gas | $55,113 | 4,695 | MMBtu | $11.74 |
TOTAL ENERGY COSTS | $848,121 | |||
RECOMMENDED SAVINGS* | $798,946 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $564,124 Cost: $638,912 |
$270,148 | 1,388,220 | $293,976 | 5,880 | - | - | - | - |
$270,148 1,388,220 kWh |
$293,976 5,880 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL |
Savings: $82,562 Cost: $4,772 |
$(-9,949) | (-51,125) | $92,511 | 1,850 | - | - | - | - |
$(-9,949) (-51,125) kWh |
$92,511 1,850 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $3,786 Cost: $6,845 |
- | - | - | - | $3,786 | 323 | - | - |
- - kWh |
- - kW-months/year |
$3,786 323 MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,835 Cost: $3,044 |
$4,291 | 22,052 | $1,544 | 31 | - | - | - | - |
$4,291 22,052 kWh |
$1,544 31 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $107,677 Cost: $47,756 |
$(-69,965) | (-359,535) | $(-33,570) | (-671) | - | - | $211,212 | 370,548 |
$(-69,965) (-359,535) kWh |
$(-33,570) (-671) kW-months/year |
- - MMBtu |
$211,212 370,548 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $15,250 Cost: $16,600 |
- | - | - | - | $15,250 | 1,302 | - | - |
- - kWh |
- - kW-months/year |
$15,250 1,302 MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,187 Cost: $1,186 |
$873 | 4,485 | $314 | 6 | - | - | - | - |
$873 4,485 kWh |
$314 6 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM |
Savings: $16,147 Cost: $6,200 |
$16,147 | 82,974 | - | - | - | - | - | - |
$16,147 82,974 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,377 Cost: $250 |
$2,377 | 12,217 | - | - | - | - | - | - |
$2,377 12,217 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $798,946 Cost: $725,565 |
$213,922 | 1,099,288 | $354,775 | 7,095 | $19,037 | 1,625 | $211,212 | 370,548 | $213,922 1,099,288 kWh |
$354,775 7,095 kW-months/year |
$19,037 1,625 MMBtu |
$211,212 370,548 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) |