Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2025 |
Principal Product | Sodium and Potassium Silicates |
NAICS | 325180 - Other Basic Inorganic Chemical Manufacturing |
SIC | 2819 - Industrial Inorganic Chemicals, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 9 |
Plant Area (Sq.Ft.) | 259,618 |
Annual Production | 20,800 Tons |
Production Hrs. Annual | 6,720 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $204,178 | 1,167,006 | kWh | $0.17 |
Electricity Demand | $47,471 | 3,186 | kW-months/year | $14.90 |
Electricity Fees | $8,025 | - | $ | - |
Natural Gas | $634,979 | 135,297 | MMBtu | $4.69 |
TOTAL ENERGY COSTS | $894,653 | |||
RECOMMENDED SAVINGS* | $174,899 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $24,489 Cost: $112,796 |
$17,999 | 102,850 | $6,490 | 436 | - | - | - | - | - | - |
$17,999 102,850 kWh |
$6,490 436 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL |
Savings: $11,678 Cost: $2,631 |
$(-3,524) | (-20,138) | $15,202 | 1,020 | - | - | - | - | - | - |
$(-3,524) (-20,138) kWh |
$15,202 1,020 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $565 Cost: $847 |
$490 | 2,803 | $75 | 5 | - | - | - | - | - | - |
$490 2,803 kWh |
$75 5 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,349 Cost: - |
$5,349 | 30,565 | - | - | - | - | - | - | - | - |
$5,349 30,565 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $16,016 Cost: $8,765 |
$13,903 | 79,444 | $2,114 | 142 | - | - | - | - | - | - |
$13,903 79,444 kWh |
$2,114 142 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,804 Cost: $3,518 |
$4,170 | 23,833 | $634 | 43 | - | - | - | - | - | - |
$4,170 23,833 kWh |
$634 43 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $30,634 Cost: - |
- | - | - | - | - | - | - | - | $30,634 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$30,634 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $21,315 Cost: $2,000 |
- | - | - | - | $21,315 | 4,545 | - | - | - | - |
- - kWh |
- - kW-months/year |
$21,315 4,545 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $16,737 Cost: $8,530 |
$14,528 | 83,017 | $2,209 | 148 | - | - | - | - | - | - |
$14,528 83,017 kWh |
$2,209 148 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4157 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING |
Savings: $43,311 Cost: $4,700 |
$(-1,517) | (-8,669) | $(-231) | (-15) | - | - | $45,059 | 4,864 | - | - |
$(-1,517) (-8,669) kWh |
$(-231) (-15) kW-months/year |
- - MMBtu |
$45,059 4,864 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $174,899 Cost: $143,787 |
$51,398 | 293,705 | $26,493 | 1,778 | $21,315 | 4,545 | $45,059 | 4,864 | $30,634 | - | $51,398 293,705 kWh |
$26,493 1,778 kW-months/year |
$21,315 4,545 MMBtu |
$45,059 4,864 Tgal |
$30,634 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | One-time Revenue or Avoided Cost |