IAC logo
IAC Assessment: SD0678
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0678
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2025
Principal Product CNC Machining
NAICS 332710 - Machine Shops
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $10,000,000-$50,000,000
# of Employees 97
Plant Area (Sq.Ft.) 65,000
Annual Production 500 Units
Production Hrs. Annual 3,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,814 326,894 kWh $0.07
Electricity Demand $107,642 2,938 kW-months/year $36.64
TOTAL ENERGY COSTS $131,456
RECOMMENDED SAVINGS* $72,191 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$156
Cost:
$424
$46 626 $110 3 - - $46
626
kWh
$110
3
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$947
Cost:
$3,752
$323 4,430 $624 17 - - $323
4,430
kWh
$624
17
kW-months/year
-
-
$
03: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$50,863
Cost:
$545,300
$36,681 503,167 $14,182 387 - - $36,681
503,167
kWh
$14,182
387
kW-months/year
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,339
Cost:
$25,895
$2,339 32,092 - - - - $2,339
32,092
kWh
-
-
kW-months/year
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,200
Cost:
$3,396
$560 7,681 $1,640 45 - - $560
7,681
kWh
$1,640
45
kW-months/year
-
-
$
06: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$14,843
Cost:
$23,800
$13,237 181,584 - - $1,605 - $13,237
181,584
kWh
-
-
kW-months/year
$1,605
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$843
Cost:
$2,979
$323 4,430 $520 14 - - $323
4,430
kWh
$520
14
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$72,191
Cost:
$605,546
$53,509 734,011 $17,076 466 $1,605 - $53,509
734,011
kWh
$17,076
466
kW-months/year
$1,605
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $