IAC Assessment: SD0679
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0679
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2025
Principal Product Cementitious Material
NAICS 488490 - Other Support Activities for Road Transportation
SIC 4789 - Transportation Services, Nec
Sales $5,000,000-$10,000,000
# of Employees 4
Plant Area (Sq.Ft.) 6,103
Annual Production 98,805 Tons
Production Hrs. Annual 2,730
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,292 217,767 kWh $0.28
Electricity Demand $94,351 2,510 kW-months/year $37.60
TOTAL ENERGY COSTS $154,643
RECOMMENDED SAVINGS* $67,227 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$18,281
Cost:
$1,472
$(-3,181) (-11,487) $21,462 571 $(-3,181)
(-11,487)
kWh
$21,462
571
kW-months/year
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,125
Cost:
-
$5,125 18,508 - - $5,125
18,508
kWh
-
-
kW-months/year
03: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$10,098
Cost:
-
- - $10,098 269 -
-
kWh
$10,098
269
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$33,723
Cost:
$25,291
$33,723 121,787 - - $33,723
121,787
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$67,227
Cost:
$26,763
$35,667 128,808 $31,560 839 $35,667
128,808
kWh
$31,560
839
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand