IAC logo
IAC Assessment: SF0040
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0040
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1994
Principal Product Light Fixtures
NAICS n/a
SIC 3646 - Commercial Lighting Fixtures
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 180,000
Annual Production 1,300,000 Pieces
Production Hrs. Annual 2,808
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $210,152 1,899,766 kWh $0.11
Natural Gas $117,321 20,173 MMBtu $5.82
TOTAL ENERGY COSTS $327,473
RECOMMENDED SAVINGS* $8,148 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,148
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$973
Cost:
$1,785
$973 8,792 $973
8,792
kWh
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,250
Cost:
-
$1,250 11,430 $1,250
11,430
kWh
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$811
Cost:
$1,150
$811 - $811
-
kWh
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$409
Cost:
$1,013
$409 3,810 $409
3,810
kWh
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$444
Cost:
-
$444 4,103 $444
4,103
kWh
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,261
Cost:
$600
$4,261 38,980 $4,261
38,980
kWh
TOTAL RECOMMENDED Savings:
$8,148
Cost:
$4,548
$8,148 67,115 $8,148
67,115
kWh
TOTAL IMPLEMENTED Savings:
$8,148
Cost:
$4,548
$8,148 67,115 $8,148
67,115
kWh